Power Factor Analysis (Sample)

The Widget Factory

Power Factor Analysis
Rate 21 SD
General Service - Large

Month
Indicated
kW
Power
Factor
Present
Billing
kVA
Billing
kVA at
90% PF
Billing
kVA at
95% PF
Billing
kVA at
98% PF
January
215.0
94.0
263.8
263.8
248.6
241.0
February
215.5
94.9
263.8
263.8
248.6
241.0
March
220.2
95.0
263.8
263.8
248.6
241.0
April
201.0
95.4
263.8
263.8
263.8
241.0
May
250.0
93.8
266.5
266.5
263.2
255.1
June
171.0
91.1
297.5
297.5
285.3
276.5
July
272.0
91.0
298.9
298.9
286.3
277.6
August
295.2
89.5
329.8
328.0
310.7
301.2
September
286.0
91.0
314.3
314.3
301.1
291.8
October
280.3
91.1
307.7
307.7
295.1
286.0
November
260.0
93.1
279.3
279.3
273.7
265.3
December
235.0
94.5
263.8
263.8
248.6
241.0
TOTAL:
3,001.2
 
 
3,411.2
3,273.6
3,158.5
AVERAGE:
250.1
92.9
284.4
284.3
272.8
 
PEAK:
295.2
89.5
 
 
 
263.2
Account #:
1234-56
 
 
Rate Schedule: General Service - Large
 
Contract Capacity: 0 kVA
 
Correction to 90%:
Add 6 kVAR @ 208 Volts
Estimated Annual Savings:
1 kVA X $5.75/kVA=$5.75
 
Installed Cost:
$166 to $249
 
 
Simple Payback:
28.91 to 43.36 Years
 
Correction to 95%:
Add 67 kVAR @ 208 Volts
Estimated Annual Savings:
139 kVA X $5.75/kVA=$799.25
 
Installed Cost:
$2,004 to $3,006
 
 
Simple Payback:
2.51 to 3.76 Years
 
Correction to 98%:
Add 116 kVAR @ 208 Volts
Estimated Annual Savings:
254 kVA X $5.75/kVA=$1,460.50
 
Installed Cost:
$3,487 to $5,231
 
 
Simple Payback:
2.39 to 3.58 Years
 
NOTE:
Capacitors were sized based on the peak demand and associated power factor.
The above capacitors may not be standard sizes available from a manufacturer.
Nearest standard rating should be installed.
Example: If calculation was 58 kVAR, next standard size is 60 kVAR.
Installed cost based on $30 to $45 per kVAR.
Customer Toolbox Login